Engineering Change Order (ECO / PLM)
Effectivity-aware engineering change orders with BOM diffing, where-used impact analysis, approval sign-offs and stock disposition
Effectivity-aware engineering change orders with BOM diffing, where-used impact analysis, approval sign-offs and stock disposition
Key Features
Engineering Change Approval
Engineering Change Approval. Tracks Engineering Change Order, Sequence, Approver, Mandatory, Decision Date. One-click approve, reject, reset to pending.
Engineering Change Stock Disposition
Engineering Change Stock Disposition. Tracks Engineering Change Order, Component, Stock Location, Quantity, Responsible. One-click mark close, reset to pending.
Engineering Change Impact (Where-Used Analysis)
Engineering Change Impact (Where-Used Analysis). Tracks Engineering Change Order, Affected Product, Affected Bill of Materials, Qty On Hand, Open Manufacturing Orders.
Engineering Change Order
Engineering Change Order. Tracks ECO Number, Change Type, Stage, Product, Bill of Materials. One-click submit, start review, approve stage, apply, close.
Engineering Change Stage
Engineering Change Stage. Tracks Stage Name, Sequence, Folded in Kanban, Closing Stage, Requires Full Sign-off.
Engineering Change Type
Engineering Change Type. Tracks Type Name, Code, Sequence, Color Index, Requires Stock Disposition.
Use Cases
Screenshots
Stock Dispositions
Whereused Impact
Change Lines
Engineering Change Order
Eco Stages
Eco Types
Specifications
- Compatible: Odoo 18.0 / 19.0
- License: OPL-1
- Languages: 35+
- Author: Pokutsoft
- Dependencies: mrp, mail
- Support: support@pokutsoft.com
- Update date: 2026-07-18